We have been planning and dreaming about this day since we bought our house but, knew it would be quite the project! We got a quote in early June. they quoted us $31,000!! so we decided to just do it our self's like everything else. We completed the whole thing for right around $7,000
![]() |
| Before... |
![]() |
| The first task was to empty the old storage room this is just the food products. |
![]() |
| DEMO!! |
![]() |
| Wall demoed, ready for the plumbers. you can see that bathroom lay out if you look at the black writing on the floor. |
![]() |
| Next project talk out old nasty sink next to dryer. |
![]() |
| Now its ready! |
![]() |
| While they were at it we had them add a drain by the water heater and a new floor drain in the now storage room. |
![]() |
| Lue supervised. |
![]() |
| And cookie hid from the noise. |
![]() |
| Quite the concrete pile!! |
![]() |
| Thank you shamrock plumbing! |
![]() |
| All done for the day! |
![]() |
| Our old floor drain they said when they pulled it out it literally just fell apart. |
![]() |
| Plumbing all done and bathtub installed. |
![]() |
| The kids helped paint the storage room shelfs a better color since wood is so expensive right now we re-used the old ones. |
![]() |
| Then had fun picking paint off them self's after. |
![]() |
| Getting ready to fill in the holes from the new plumbing. |
![]() |
| We started out mixing the cement inside then moved it out side because it was a huge mess. |
![]() |
| Korbyn thought the pile was fun to play on. |
![]() |
| We found kitty prints the next morning. |
![]() |
| Kitty sleeping in the mess! |
![]() |
| Cutting shelving to fit the new space. |
![]() |
| All ready for stuff! |
![]() |
| The pile just kept getting bigger! |
![]() |
| Finally access to the bathroom from our room. |
![]() |
| New roof.... |
![]() |
| and wall. |
![]() |
| Time from a trip to the dump. |
![]() |
| Tile time!! |
![]() |
| Ready for pain! The red stuff is water seal so nothing can get the dry wall wet and ruin it. |
![]() |
| Bathtub done just needing to dry. We had neighbor help us with the tile because to have some one come do it would have been a 2 month wait. |
![]() |
| Floor!! |
![]() |
| Grouted!! |
![]() |
| We paid Shamrock to come back and do finishes for us like installing the toilet, shower head and faucet. |
![]() |
| And i made a one Last run to Lowes or a mirror toilet paper holder and towel rack and Target to get towel's and rugs to finish off the look. |
![]() |
| The last thing was to build me a closet since mine was compromised to gain access to the bathroom. |
![]() |
| We used left over paint to paint the shelves so it all matches! |
I'm so glad this project is done! it took longer then we would have hoped but the money we saved was worth it.