We have been planning and dreaming about this day since we bought our house but, knew it would be quite the project! We got a quote in early June. they quoted us $31,000!! so we decided to just do it our self's like everything else. We completed the whole thing for right around $7,000
Before... |
The first task was to empty the old storage room this is just the food products. |
DEMO!! |
Wall demoed, ready for the plumbers. you can see that bathroom lay out if you look at the black writing on the floor. |
Next project talk out old nasty sink next to dryer. |
Now its ready! |
While they were at it we had them add a drain by the water heater and a new floor drain in the now storage room. |
Lue supervised. |
And cookie hid from the noise. |
Quite the concrete pile!! |
Thank you shamrock plumbing! |
All done for the day! |
Our old floor drain they said when they pulled it out it literally just fell apart. |
Plumbing all done and bathtub installed. |
The kids helped paint the storage room shelfs a better color since wood is so expensive right now we re-used the old ones. |
Then had fun picking paint off them self's after. |
Getting ready to fill in the holes from the new plumbing. |
We started out mixing the cement inside then moved it out side because it was a huge mess. |
Korbyn thought the pile was fun to play on. |
We found kitty prints the next morning. |
Kitty sleeping in the mess! |
Cutting shelving to fit the new space. |
All ready for stuff! |
The pile just kept getting bigger! |
Finally access to the bathroom from our room. |
New roof.... |
and wall. |
Time from a trip to the dump. |
Tile time!! |
Ready for pain! The red stuff is water seal so nothing can get the dry wall wet and ruin it. |
Bathtub done just needing to dry. We had neighbor help us with the tile because to have some one come do it would have been a 2 month wait. |
Floor!! |
Grouted!! |
We paid Shamrock to come back and do finishes for us like installing the toilet, shower head and faucet. |
And i made a one Last run to Lowes or a mirror toilet paper holder and towel rack and Target to get towel's and rugs to finish off the look. |
The last thing was to build me a closet since mine was compromised to gain access to the bathroom. |
We used left over paint to paint the shelves so it all matches! |
I'm so glad this project is done! it took longer then we would have hoped but the money we saved was worth it.
No comments:
Post a Comment